Aquatherm 16204-10 User Manual

Browse online or download User Manual for Above ground pool accessories Aquatherm 16204-10. Aquatherm 16204-10 User's Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
INDUSTRIES INCORPORATED
MANUAL CONTENTS
This manual provides a detailed step-by-step pro-
cedure for the installation of an Aquatherm
Industries solar pool heating system. If the direc-
tions are followed correctly and only recommended
Aquatherm Industries hardware and components
are used, the installed system should provide years
of trouble free service, savings, and enjoyment.
CAUTION: SOLAR COLLECTORS ARE OFTEN INSTALLED
ON THE ROOFS OF BUILDINGS. UNLESS YOU ARE VERY
FAMILIAR WITH WORKING ON ROOFS AND HAVE THE
PROPER LADDERS AND SAFETY EQUIPMENT FOR
SUCH WORK, YOU SHOULD HIRE SOMEONE WITH THE
NECESSARY EXPERIENCE TO DO THE INSTALLATION.
FAILURE TO OBSERVE SAFE PRACTICES ON A ROOF OR
OTHER ELEVATED STRUCTURE MAY RESULT IN FALLING,
LEADING TO SERIOUS INJURY TO YOU.
• SAVE INSTALLATION TIME AND AVOID CALL-BACKS •
• READ THIS MANUAL BEFORE MOUNTING COLLECTORS •
SWIMMING POOL
SOLAR HEATING SYSTEMS
INSTALLATION MANUAL FOR
AQUATHERM INDUSTRIES
SOLAR COLLECTORS
FOR MODEL NUMBERS:
10001-5
10001-2
10001-1
10204-12
10204-10
10204-8
16104-12
16104-10
16104-8
16204-12
16204-10
16204-8
Page view 0
1 2 3 4 5 6 ... 11 12

Summary of Contents

Page 1 - SOLAR COLLECTORS

INDUSTRIES INCORPORATEDMANUAL CONTENTSThis manual provides a detailed step-by-step pro-cedure for the installation of an AquathermIndustries solar po

Page 2 - MOUNTING COMPONENTS

VACUUM RELIEFVALVEFEEDOUTLETENDCAPENDCAPENDCAPVACUUM RELIEFVALVEVACUUM RELIEFVALVE10Figure 12Manual Control of SystemTo test collector operation, foll

Page 3

11remove the vacuum relief valve(s) and replace it with andend cap. Relocate a vacuum relief valve to a position inthe inlet piping which is at a heig

Page 4 - MOUNTING THE SOLAR COLLECTORS

SOLARCOLLECTORSEND CAPOUTLET LINETHERMOMETER(optional)ISOLATION CHECKVALVE (optional)HEATER(optional)HEATER BY-PASSBALL VALVE (optional)HEATEDWATER

Page 5 - Figure 4

2MOUNTINGCOMPONENTSDIAGRAMMOUNTING COMPONENTSThis section provides descriptions and part numbers of theAquatherm Industries Installation Kits required

Page 6 - Figure 9

Aluminum Mounting Bracket & Header Clamp Assembly3Hold-Down Strap is required to secure collectors tothe counting surface. Use strap 10035-1 (54’)

Page 7 - System Piping

VACUUM RELIEF VALVENote: This end of row lower thanopposite end. See instruction 2.FLOWINLET(from pool)OUTLET(to pool)FLOWENDCAPINLET OUTLETVACUUMRE

Page 8 - 3.0/11.4 2.5/9.5 2.0/7.6

51) Determine the position of the last outlet header hold-down bracket for the row of collectors. Mark this point on theroof. The collector outlet hea

Page 9 - Figure 11

67) Proceed to the lower chalk line previously snapped onthe roof for the hold-down strap brackets. Mark a hole 2”(5cm) to the side of the first colle

Page 10 - Vacuum Relief Valve Test

SOLARCOLLECTORSEND CAPOUTLET LINETHERMOMETERS(optional)ISOLATION CHECKVALVE (optional)HEATER(optional)HEATER BY-PASSBALL VALVE (optional)HEATEDWATER

Page 11 - COLLECTOR REPAIR

8Manual SystemsSome systems can employ a manual control valve to con-trol the flow of water thru the solar collectors, although thismay reduce the ove

Page 12 - 1-800-227-7657

VACUUMRELIEFVALVESTEEELBOWENDCAPELBOWSRETURN FROMHIGHEST POINTTEEENDCAPSINLET(from pool)OUTLET(to pool)9Figure 11DIVIDEDSYSTEMASSEMBLYON ROOFSpecial S

Comments to this Manuals

No comments