INDUSTRIES INCORPORATEDMANUAL CONTENTSThis manual provides a detailed step-by-step pro-cedure for the installation of an AquathermIndustries solar po
VACUUM RELIEFVALVEFEEDOUTLETENDCAPENDCAPENDCAPVACUUM RELIEFVALVEVACUUM RELIEFVALVE10Figure 12Manual Control of SystemTo test collector operation, foll
11remove the vacuum relief valve(s) and replace it with andend cap. Relocate a vacuum relief valve to a position inthe inlet piping which is at a heig
SOLARCOLLECTORSEND CAPOUTLET LINETHERMOMETER(optional)ISOLATION CHECKVALVE (optional)HEATER(optional)HEATER BY-PASSBALL VALVE (optional)HEATEDWATER
2MOUNTINGCOMPONENTSDIAGRAMMOUNTING COMPONENTSThis section provides descriptions and part numbers of theAquatherm Industries Installation Kits required
Aluminum Mounting Bracket & Header Clamp Assembly3Hold-Down Strap is required to secure collectors tothe counting surface. Use strap 10035-1 (54’)
VACUUM RELIEF VALVENote: This end of row lower thanopposite end. See instruction 2.FLOWINLET(from pool)OUTLET(to pool)FLOWENDCAPINLET OUTLETVACUUMRE
51) Determine the position of the last outlet header hold-down bracket for the row of collectors. Mark this point on theroof. The collector outlet hea
67) Proceed to the lower chalk line previously snapped onthe roof for the hold-down strap brackets. Mark a hole 2”(5cm) to the side of the first colle
SOLARCOLLECTORSEND CAPOUTLET LINETHERMOMETERS(optional)ISOLATION CHECKVALVE (optional)HEATER(optional)HEATER BY-PASSBALL VALVE (optional)HEATEDWATER
8Manual SystemsSome systems can employ a manual control valve to con-trol the flow of water thru the solar collectors, although thismay reduce the ove
VACUUMRELIEFVALVESTEEELBOWENDCAPELBOWSRETURN FROMHIGHEST POINTTEEENDCAPSINLET(from pool)OUTLET(to pool)9Figure 11DIVIDEDSYSTEMASSEMBLYON ROOFSpecial S
Comments to this Manuals